New 6-man Chair and the La Tania Green Piste
Latest photographs on the on-going work on the ski area
September 2005
The new Chapelets hi-speed 6-pack lift at the far end of 1650.
Putting the cable on the new pylons. Both of the long Bel Air & Signal drag lifts
(and the bridge) have been removed and the piste reshaped.
Tree cutting to form the new green beginners piste down from the Gondola to resort
The run twists and turns down the mountain over toward the Murettes piste...
and cuts back across towards Morreta Blanche Piste
The last night of Summer in The Ski Lodge - Thanks to NickSki for the pics.