The cables are now installed on the Bouc Blanc 6-seater chairlift above La Tania and all looks on track for a December 2013 opening.
Lots of work going ahead on the new Foret Chair up from Le Praz to the La Tania top Gondola station too – this is scheduled for December 2014 however (they couldn’t start work earlier due to some birds nesting – honest!).
Many thanks to Nick Ski as always for the pics www.nickskithreevalleys.co.uk